Minutes: |
109th meeting |
07.12.09 |
PDF, Slides |
|
|
|
108th meeting |
09.11.09 |
PDF, Slides |
|
|
|
107th meeting |
12.10.09 |
PDF, Slides |
|
|
|
106th meeting |
21.09.09 |
PDF, Slides |
|
|
|
105th meeting |
07.09.09 |
PDF, Slides |
|
|
|
104th meeting |
24.08.09 |
PDF, Slides |
|
|
|
103rd meeting |
27.04.09 |
PDF, Slides |
|
|
|
102nd meeting |
30.03.09 |
PDF, Slides |
|
|
|
101st meeting |
23.03.09 |
PDF, Slides |
|
|
|
100th meeting |
16.03.09 |
PDF, Slides |
|
|
|
99th meeting |
02.03.09 |
PDF, Slides |
|
|
|
98th meeting |
16.02.09 |
PDF, Slides |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
07.12.09 Minutes (PDF)
Regular collimation status reports
R. Losito: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning (PDF)
A. Bertarelli: Phase 2 at CERN
T. Markiewicz, J. Smith: Phase 2 at SLAC (PDF1, PDF2)
M. Brugger: FLUKA work
Rond table discussion on LHC beam test program.
09.11.09 Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning
A. Bertarelli: Phase 2 at CERN (PDF)
T. Markiewicz: Phase 2 at SLAC (PDF)
F. Cerutti: FLUKA work (PDF)
A. Rossi: Beam losses and collimation cleaning at 3.5 TeV (PDF)
12.10.09 Minutes (PDF)
Regular collimation status reports
R. Losito: Hardware and tunnel activities
S. Redaelli: Remote and beam commissioning (PDF)
R. Assmann: Phase 2 at CERN
J. Smith : Phase 2 at SLAC (PDF)
V. Vlachoudis: FLUKA work (Introductory slides by Ralph, PDF)
C. Bracco: Collimator Analysis Program (CAP) tool (PDF)
21.09.09 Minutes (PDF)
Regular collimation status reports
R. Losito: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning
A. Bertarelli: Phase 2 at CERN
FLUKA work
S. Lundgren : Detailed status report on Phase II at SLAC (PDF)
T. Kramer: Losses on TCTs from asynchronous dump (PDF)
C. Bracco: Collimator Analysis Program (CAP) tool [postponed]
C. Boccard: Performance on BPM integrated in PII collimator (PDF)
07.09.09 Minutes (PDF)
R. Assmann: Collimator project organization (PDF)
Regular collimation status reports
R. Losito: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning
A. Bertarelli: Phase 2 at CERN
J. Smith: Phase 2 at SLAC (PDF)
F. Cerutti: FLUKA work (PDF)
A. Bertarelli: Discussion on procedure for SPS-LSS5 layout change (discussion)
F. Roncarolo: TCL simulations (PDF)
A. Rossi: Collimator setting proposal for 3.5 TeV (PDF)
D. Wollmann: Collimator data access tool for commissioning (PDF)
24.08.09 Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning
A. Dallocchio : Phase 2 at CERN (PDF)
S. Lundgren: Phase 2 at SLAC (PDF)
L. Lari: FLUKA work
C. Bracco: Commissioning scenarios and availability of loss data (PDF)
S. Redaelli: Final implementation of RBAC for collimation (PDF)
F. Roncarolo: TCL simulations (PDF - Postponed to next meeting)
27.04.09 Minutes (PDF)
S. Redaelli: Status of CCC applications (PDF)
M. Ph. Dutour: Roman pot control system (PDF)
M. Deile: The interlocks (PDF)
X. Pons: Position control of the Roman pot (PDF)
30.03.09 Minutes (PDF)
Dry-runs of review talks - final slides available on the review web page!
G. Bellodi: Improved Ion Collimation Efficiency
E. Metral: Collimation-Driven Impedance
D. Macina: Requirements from Experiments
Heinz Vincke: RP aspects
R. Assmann for T. Weiler: Improved cleaning
23.03.09 Minutes (PDF)
F. Cerutti: Update of FLUKA simulations for Phase II (PDF)
T. Markiewicz: Status of Phase II hardware at SLAC (PDF)
16.03.09 Minutes (PDF)
R. Assmann: Overview of the Phase II solutions [dry-run] (PDF)
J. Smith: Integration of a Hollow Electron Lens Scraper into the
LHC Collimation System (PDF)
02.03.09 Minutes (PDF)
R. Assmann: Organization of the Phase II review (Programme on INDICO)
V. Vlachoudis: Status of FLUKA studies for Phase II collimation (PDF)
G. Bellodi: Ion collimation performance during energy ramp (PDF)
F. Arnold-Malandain: New temperature sensors in IP3 and IP7 (PDF)
A. Marsili: Presentation of PhD work on beam loss studies (PDF)
16.02.09 Minutes (PDF)
M. Sapinski: BLM quench threshold estimates on the MB magnet (PDF)
V. Previtali: Trip report from Tevatron - crystal experiments (PDF)
|