Minutes: |
122th meeting |
08.11.10 |
PDF |
|
|
|
121th meeting |
25.10.10 |
PDF |
|
|
|
120th meeting |
30.08.10 |
PDF |
|
|
|
119th meeting |
19.07.10 |
PDF |
|
|
|
118th meeting |
05.07.10 |
PDF |
|
|
|
117th
meeting |
07.06.10 |
PDF |
|
|
|
116th meeting |
10.05.10 |
PDF |
|
|
|
115th meeting |
24.04.10 |
PDF |
|
|
|
114th meeting |
12.04.10 |
PDF |
|
|
|
113th meeting |
15.03.10 |
PDF |
|
|
|
112th meeting |
01.03.10 |
PDF |
|
|
|
111th meeting |
15.02.10 |
PDF |
|
|
|
110th meeting |
01.02.10 |
PDF |
|
|
|
|
|
|
|
|
08.11.10 Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning
R. Assmann: Phase II activities at CERN
T. Markiewicz: Phase II activities at SLAC (PDF)
G. Valentino: News on Ion
Loss Maps
(PDF)
G. Bellodi:
LHC Ion Loss Maps (PDF)
D. Macina:
Modifications of the LSS2 (TCTVB-ZDC) (PDF)
E. Page, JP Corso, O.
Aberle:
LSS2 modifications and Impact on Vacuum (PDF)
A.
Nordt:
Results from TCP
Tests from 25-10-2010
(PDF)
25.10.10 Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning
R. Assmann: Phase II activities at CERN
T. Markiewicz: Phase II activities at SLAC
R. Bruce: 3.5TeV
Simulations of Losses and News on beta* Limits
(PDF)
D. Wollmann:
Operational Performance (PDF)
G. Bellodi:
Ions: Needs for Collimation (PDF)
30.08.10 Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning
R. Assmann: Phase II activities at CERN
T. Markiewicz: Phase II activities at SLAC (PDF)
V. Parma: Cryo-collimator integration and interfaces
D. Wollmann: Update on
Loss Maps (PDF)
F. Burkart:
Update on Halo Scraping (PDF)
Y. Levinsen:
Simulation of Loss Maps for Dust Particles (PDF)
A. Nordt:
Analysis
of the Beam Dump triggered
on 25-08-2010 (PDF)
19.07.10 Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning
R. Assmann: Phase II activities at CERN
J. Smith: Phase II activities at SLAC (PDF)
V. Parma: Cryo-collimator integration and interfaces (PDF)
G. Bellodi: Safe Beam Flag
and BLMs thresholds for Ion Runs (PDF)
J. Jowett: Modified
Collimation Layout & Optics for Cry coll. in IR 3 (PDF)
05.07.10
Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel activities
R. Assmann: Remote and beam commissioning
Phase II activities at CERN
T.
Markiewicz: Phase II at SLAC (PDF)
Cryo-collimators installation
FLUKA work
G. Bellodi
Collmation setup for ion commissioning: initial studies (PDF)
N. Mounet First
comparison between phase 1 and IR3MBC (PDF)
07.06.10
Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel
activities
R. Assmann: Remote and beam
commissioning
A. Dallocchio: Phase II activities at CERN (link)
T.
Markiewicz: Phase II at SLAC
J-Ph. Tock: Cryo-collimators
installation (PDF)
F. Cerutti: FLUKA work
A. Rossi
Update on IR3 combined cleaning study (PDF)
E. Metral
Update on impedance (PDF)
O. Aberle
Phase II in warm regions (PDF)
10.05.10
Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel
activities
R. Assmann: Remote and beam
commissioning
F. Cerutti: FLUKA
work
T.
Markiewicz: Phase II at SLAC
J-Ph. Tock: Cryo-collimators
installation
F.
Cerutti: Update from FLUKA on cry-collimators (PDF)
G. Bellodi:
Requirements for ion operations Phase II (PDF)
26.04.10
Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel
activities
S. Redaelli: Remote and beam
commissioning
F. Cerutti: FLUKA
work
A. Bertarelli: Phase II at
CERN (PDF)
S. Lundgren : Phase
II at SLAC (PDF)
V. Parma: Cryo-collimators
installation
K.
Roeed: Warm/Cold losses at 3.5TeV (PDF)
D. Wollmann:
Results from collimation setup (PDF)
R. Bruce:
Generating machine collimation settings from beam data (PDF)
12.04.10
Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel
activities
R. Assmann: Remote and beam
commissioning
F. Cerutti: FLUKA
work
A. Dallocchio: Phase II at
CERN
J. Smith : Phase II
at SLAC
J-Ph. Tock: Cryo-collimators
installation
L. Keller, SLAC: Comparison of carbon and Hi-Z primary collimators for
Phase 2 (PDF)
J. Jowett:
Layout studies for IR3 cryo-collimators (PDF)
15.03.10
Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel
activities
R. Assmann: Remote and beam
commissioning
V. Vlachoudis: FLUKA
work
A. Dallocchio: Phase II at
CERN (PDF)
J. Smith : Phase II
at SLAC (PDF)
J-Ph. Tock: Cryo-collimators
installation
G. Stancari, Fermilab: Studies on collimation with hollow electron beams
(PDF)
J-Ph. Tock: Status report on integration of cryogenics collimator (PDF)
E. Metral: Answers to SLAC people concerning their simulations of
trapped modes and
news on impedance for the phase 1 and 2 at CERN (PDF)
01.03.10
Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel
activities
R. Assmann: Remote and beam
commissioning
V. Vlachoudis: FLUKA
work
A. Bertarelli: Phase II at
CERN
J. Smith : Phase II
at SLAC (PDF)
J-Ph. Tock: Cryo-collimators
installation
R. Assmann: Round the table collection of collimator beam test proposals
for 2010
Liling Xiao
(SLAC): Trapped Modes simulations (PDF)
15.02.10
Minutes (PDF)
Regular collimation status reports
O. Aberle: Hardware and tunnel
activities
R. Assmann: Remote and beam
commissioning
V. Vlachoudis: FLUKA
work
A. Bertarelli: Phase II at
CERN
J. Smith : Phase II
at SLAC (PDF)
J-Ph. Tock: Cryo-collimators
installation
N. Mounet: Tune shifts in the LHC from
collimators impedance (PDF)
E. B. Holzer:
BLM – channels with filters (PDF)
L. Lari:
Latest results on SLAC phase 2 collimators – FLUKA (PDF)
01.02.10
Minutes (PDF)
Regular collimation status reports
R. Assmann: Hardware and tunnel
activities
J. Smith : Phase II
at SLAC (PDF)
F. Cerutti:
FLUKA work
J-Ph. Tock: Modification of SC dispersion
suppressors to accommodate additional collimators (PDF)
C. Bracco:
Collimators and Beam Cleaning: First Results and Future Plans (Evian
2010) (PDF)
R. Assmann:
Summary of the Collimation Upgrade Plans (Chamonix 2010) (PDF)
|